30+ Years of Excellence

full bathrrom renovation project done by keen improvements

Why Choose Us

The Only Time You Get to Fix Everything at Once

Keen Improvements has been renovating bathrooms across the Hudson Valley since 2008. A full renovation is different from a refresh. Everything comes out, the framing is exposed, and every problem hiding behind tile and drywall becomes visible and fixable.

We manage the full project from demolition through final finishing. Structural repairs, plumbing, electrical, waterproofing, tile, fixtures, lighting, and ventilation. One point of contact, one written scope confirmed before work begins.

Grout that keeps failing. A shower that never dries. A floor that flexes near the toilet. Those are symptoms of something behind the wall, and a cosmetic update only buys a couple of years before they come back.

What We Find Behind the Walls

Hudson Valley Housing Stock Has a Pattern

We have opened up bathrooms in colonials from the 1920s, mid-century ranches, farmhouses that predate the plumbing inside them, and 1980s builds where the shortcuts are newer but no less real. The same failures show up again and again in this region. Here is what we expect to find and what it means for your project.

Galvanized supply lines closing from the inside

Common in homes built before roughly 1960. Galvanized steel corrodes internally, and the pipe narrows year after year until pressure drops and rust colors the water. From the outside the pipe looks fine. Once the wall is open, we can see the wall thickness and the threaded joints, which is where failure starts. Replacing supply lines is straightforward while the studs are exposed and expensive once they are covered again.

Subfloor rot at the toilet flange and tub apron

The two places water gets in without anyone noticing. A wax ring that failed years ago, or a tub that was never properly sealed at the apron, and the plywood underneath softens quietly. You feel it as a spongy spot near the toilet or a floor that moves slightly when you step out of the tub. On a gut, we pull the subfloor and check the joists. Sometimes it is one sheet of plywood. Sometimes it is sistering a joist that has been wet for a decade.

Ventilation that was never adequate

Older Hudson Valley bathrooms were often built with no exhaust fan at all, or with a fan vented into the attic instead of outside. Humid air goes up, hits a cold roof deck, condenses, and comes back down through the insulation. That is where the mildew smell and the stained ceiling below come from. Getting a properly sized fan ducted to the exterior is simple work with the ceiling open and disruptive work later.

Drain slope that was close enough

Waste lines need consistent fall. When a bathroom has been reworked once or twice over the decades, drain runs get patched, extended, and occasionally leveled out by someone in a hurry. The result is slow drains that snaking never permanently fixes. With the floor open, we can see the actual run and correct the pitch instead of treating the symptom again.

Framing that was never meant to carry what you want

Grab bars need blocking. Heavy porcelain and stone tile need a stiffer floor than a 1950s builder installed. Wall-hung vanities and frameless glass need something solid behind the drywall. None of this can be added later without opening the wall back up, so a gut is the moment to put the blocking in whether you need it now or in fifteen years.

Old wiring near wet locations

Knob-and-tube and early cloth-wrapped wiring still turns up in this region, sometimes feeding a light fixture directly over a shower. Bathroom circuits also need GFCI protection and often a dedicated circuit that older homes were never wired for. Exposed framing is when this gets corrected properly.

None of this is a reason to panic. It is the reason a real estimate happens after we see the space, and the reason we tell you what we find before we proceed rather than after.

What a Full Bathroom Renovation Covers

Nothing stays. Here is the scope.

Complete demolition down to the studs and subfloor
Structural inspection and framing repairs
Subfloor replacement where rot or movement is found
Blocking for grab bars, vanities, and glass
Full plumbing rough-in, including supply and drain line replacement
Electrical rough-in for lighting, outlets, heated floors, and exhaust
Shower pan installation and full waterproofing
Floor and wall tile installation
Shower enclosure, glass, niches, and bench seating
Vanity, sink, faucet, and mirror installation
Toilet installation or repositioning
Lighting and ventilation upgrades
Paint, trim, and door work
Final finishing and full cleanup

The scope is agreed on before work begins. No changes are made without your approval.

Living Through a Renovation

What Three Weeks in Your Home Actually Looks Like

The part nobody explains until the crew is already there. Here is how we run it.

01

Dust control comes first, not last

Bathroom demolition produces a remarkable amount of drywall and tile dust, and it travels. We seal the work area, protect floors along the path in and out, and manage debris daily rather than at the end of the week.

02

Water stays on

Supply gets shut off in planned windows for the rough-in work, not for the duration of the project. We tell you when and for roughly how long before it happens.

03

If this is your only bathroom, we plan for it

Single-bathroom homes change the sequence. We keep a working toilet available as long as the plumbing allows, compress the no-fixture window, and are direct with you upfront about the days that will be genuinely inconvenient. Some homeowners arrange to be away for that stretch. Most do not need to.

04

The crew leaves at the end of the day

Work area cleaned, tools out of the hallway, path to the rest of your house clear. Our reviews say this more convincingly than we can.

Our Remodeling Process

From first call to finished space

1

Goals & Scope

Your vision, needs, and budget

2

Design & Layout

Functional plans and material selection

3

Measure & Estimate

Precise numbers, no surprises

4

Build & Deliver

Quality craftsmanship, finished space

Testimonials

What Our Clients Say

PROVEN & TRUSTED

Let's Plan Your Full Bathroom Renovation. Get a Free Estimate.

Get a free in-home estimate from Keen Improvements. We serve homeowners across the Hudson Valley from Mt. Kisco (Westchester & Putnam) and Marlboro (Dutchess, Orange & Ulster).

How long does a full bathroom renovation take?

Most full renovations take 3 to 4 weeks. A rebuild in the same footprint runs closer to 3 weeks. Layout changes, expansions, or structural repairs push toward 4 weeks or slightly beyond. We confirm the timeline before work starts and hold to it.

Every surface comes out. Tile, drywall, tub, shower, vanity, toilet, and flooring are removed until only framing and subfloor remain. That is the point where what is hidden becomes visible, and where it can be repaired before anything new goes back on.

We stop and show you. You get an explanation of what we found, what it takes to fix it, and what it costs before we proceed. Nothing gets covered back up without your knowing about it, and nothing gets added to the invoice without your approval.

Not the one being renovated. Once demolition starts, that bathroom is out of service until the fixtures go back in. If you have a second bathroom, the disruption is minimal and you will barely notice the project outside of daily crew hours. If this is your only bathroom, we sequence the work to keep a functioning toilet available as long as the plumbing allows and compress the window where nothing is usable. We tell you which days will be genuinely inconvenient before we start, not while you are living through them.

Yes. Plumbing and electrical are part of the project scope, not a separate job you have to arrange yourself. Supply and drain lines, fixture rough-in, GFCI protection, dedicated circuits, lighting, exhaust venting, and heated floor wiring are all handled as part of the renovation. You have one point of contact for the entire project and one written scope covering all of it.

Expect findings, not surprises. Older Hudson Valley homes commonly have galvanized supply lines that have narrowed from the inside, subfloor damage around the toilet flange or tub, exhaust venting that was never done correctly, and wiring that predates modern bathroom code. We look for all of it once the walls are open. What we find gets shown to you with an explanation of what it takes to fix and what it costs, before we proceed. The estimate you sign accounts for the likely condition of a home of that age, so most of what we uncover is already anticipated.

Yes. Keen Improvements is fully licensed and insured in New York State, BBB A+ Accredited since 2020, and an NKBA Remodeling Specialist. Our license numbers are listed in the footer of this site. We are happy to provide current certificates of insurance on request before any work begins.

Cost depends on the size of the bathroom, the condition of what is behind the walls, whether the layout changes, and the materials you select. A same-footprint rebuild in a bathroom with sound framing and plumbing costs less than a renovation that requires subfloor replacement, drain relocation, and a supply line rebuild. That is why we do not quote a number before seeing the space. We come to your home, assess the bathroom, walk through your goals, and give you a detailed written estimate at no cost and with no obligation.

Westchester County

Mt. Kisco, NY

  • 118 N Bedford Rd, Mt. Kisco, NY 10549
  • (914) 410-6209
  • Mon–Fri: 8am–6pm
View on Google Maps
Hudson Valley

Marlboro, NY

View on Google Maps
Scroll to Top
Call Now